Bourne Leisure, Seton Sands

The Mission: Fix a non-rotating starter motor issue in the CHP system at Seton Sands Holiday Park.

When running a holiday park, you want your visitors to have a great time and leave with happy memories. That’s why a reliable power supply is vital so that the fun never stops! At a Seton Sands holiday park, their Combined Heat and Power (CHP) system keeps things powered efficiently. But when the system failed to start, it was clear there was an issue with the starter motor.

Bourne Leisure needed an expert team to diagnose the problem, carry out repairs, and make sure the system was back in top working order – so they called in Canning.

The Solution

A non-rotating starter motor means the CHP system couldn’t fire up when needed. Bourne Leisure called us out to carry out an investigation and solve the problem. If left unresolved, this could have caused bigger problems down the line, potentially impacting energy efficiency and reliability at the holiday park.

Investigation

Our engineers arrived on-site and carried out a full inspection to get to the root of the problem. It was clear the starter motor fault was down to a detached link wire crimp at the solenoid terminal. This might sound like gobbledygook, but we were able to provide a quick, precise fix to restore functionality and prevent further issues!

Repairs & Maintenance

Once we had identified the fault, we wasted no time getting it sorted. The crimp was replaced, ensuring the starter motor could rotate properly and that the system could start up as expected. To keep everything in top condition, we also topped up the water levels and wiped down the bund, making sure the CHP system was clean and prepped for use.

Final Checks

With the park temporarily closed, we left the system switched off but prepped for the future. Now, when the holidaymakers return, the CHP system will be ready and waiting to keep the lights on and the energy flowing, without any faff.

“This might sound like gobbledygook, but we were able to provide a quick, precise fix to restore functionality and prevent further issues!”

Conclusion

At Canning, we don’t just fix what’s broken, we make sure it stays solid for the long haul. With this holiday park’s CHP system now back in working order, Bourne Leisure can crack on knowing they’ve got reliable backup power when they need it.

Another job done, another site powered. That’s how we do things!

Client
Bourne Leisure
Industry
Hospitality
Location
Seton Sands
Category
REQUEST A SITE SURVEY

We’re Ready to Meet Your Needs

Every sector has unique power needs, and we’re equipped to meet yours head-on. We listen carefully to you and deliver tailored solutions that are as diverse as the sectors we serve. Request a site survey to discover how we can keep your power flowing.